1.1.2 Contractor – New residential buildings covered by a guarantee plan, Class II

This subclass authorizes construction work on multifamily buildings held in divided co-ownership and consisting of no more than 4 storeys without taking into account, in calculating these 4 storeys, private spaces used for parking or storage.   

It also authorizes construction work governed by subclasses 2.6, 3.1, 4.1, 5.1 and 6.1 of Schedule II when said work relates to a new residential building governed by this subclass. 

Additional explanations

Note: The mandatory guarantee plan applies solely to buildings that are entirely new. 

BUILDINGS COVERED BY THE GUARANTEE PLAN

A) BUILDINGS HELD IN DIVIDED CO-OWNERSHIP

This subclass includes work related to the following buildings: 

  • a multifamily building of combustible construction held in divided co-ownership (condominium)  
  • a multifamily building of fireproof construction consisting of no more than 4 storeys and held in divided co-ownership (condominium). 

B) PREFABRICATED BUILDINGS:

  • If the sales contract is concluded with the manufacturer and includes the complete installation of the prefabricated dwelling, the manufacturer must hold a general contractor’s licence and subscribe to the guarantee plan whose protections shall apply to the contract as a whole. 
  • If the contract for the sale and installation of the prefabricated dwelling is concluded with a general contractor, the latter must hold a subclass 1.1.2 licence and subscribe to the guarantee plan whose protection applies to the contract as a whole. 
  • Furthermore, when the sales contract is concluded with the manufacturer but the installation contract is signed with a general contractor, the latter must hold a subclass 1.1.2 licence, but the guarantee plan shall only apply to work subject to the general contractor’s contract.

SPECIALIZED WORK INCLUDED IN THIS SUBCLASS

Work included in the following subclasses can be carried out by a contractor holding a subclass 1.1.2 licence, whether or not said work is listed in the licence, provided it relates to the construction of a new building governed by this subclass: 

  • 2.6 Piles and special foundations
  • 3.1 Concrete structures
  • 4.1 Masonry structures
  • 5.1 Metallic structures and prefabricated concrete elements
  • 6.1 Wood structures
  • All work included in Schedule III.

This contractor is also authorized to carry out work covered by one or several of the aforementioned specialized subclasses when said work is part of a project relating to his subclass (1.1.2).

NO LICENCE IS REQUIRED FOR THE FOLLOWING:

If in doubt as to the applicable subclass, refer to the Keyword Index or contact us.